Cases

A customized service

The track record with our Gyro steering tool and add-on modules spans in excess of 13,000 completed drills. Each project has its own story and its own hurdles that needed to be negotiated. Our reliable and unique service offering was a big driver in the completion of each of these projects. 

4 parallel drills for network platform Dolwin 6

Brownline recently surveyed a series of directional drills for networkplatform 'Dolwin6'. Two sets of parallel drills...

Read more
Johan Sverdrup Pipeline Mongstad Norway

HDD drilling Mongstad   Johan Sverdrup is one of the five largest oil fields on the Norwegian continental shelf....

Read more
Pressure-While-Drilling (PWD) protects the old inner city of Bruges

A well-known Belgian brewery commissioned a pipeline to transport their beer. The pipeline would run straight through...

Read more
Centimeter-precise punch-out in Dordrecht, The Netherlands

In this project we realized a long drill with a 60° horizontal curve. Accuracy at the exit point was paramount for...

Read more
Deep river crossing for oil & gas pipeline in Fort Mackay, Canada

In the oil-rich Alberta province, a new oil and gas pipeline needed to be installed across a river. Due to geological...

Read more
Connecting an oil pipeline to an oil terminal in Houston, USA

An oil pipeline originating from an oil terminal in the harbor of Houston needed to cross the harbor for distribution...

Read more