Cases

Brownline | Cases

A customized service

The track record with our Gyro steering tool and add-on modules spans in excess of 20,000 completed drills. Each project has its own story and its own hurdles that needed to be negotiated. Our reliable and unique service offering was a big driver in the completion of each of these projects. 

Category
Four HDD crossings for undergrounding of 150 kV lines

In September 2023, Brownline contributed to four directional drillings in Breda. Here, an overhead powerline above the...

Read more
Very long HDD outfall into the North Sea

In January 2023, Brownline contributed to a special project: installing an optic fibre connection between the United Kingdom...

Read more
Drilling to expand the power grid in Friesland

In 2022, Brownline was involved in the construction of a long cable connection in the Dutch province of Friesland. Between...

Read more
Long parallel crossings under many obstacles in Rijswijk

In June 2023, Brownline contributed to the completion of two parallel crossings in Rijswijk. To install heat pipelines,...

Read more
Three precise river crossings in Innsbruck

In March and April 2023, Brownline surveyed three HDD crossings in Innsbruck, Austria. With the Alps in the background,...

Read more
Intersect crossing under the Amsterdam Forest

In February 2023, Brownline surveyed an intersect crossing of over 1.5 km / 5,000 ft. With this crossing, HDD contractor...

Read more