Cases

Brownline | Cases

A customized service

The track record with our Gyro steering tool and add-on modules spans in excess of 20,000 completed drills. Each project has its own story and its own hurdles that needed to be negotiated. Our reliable and unique service offering was a big driver in the completion of each of these projects. 

Category
Extreme urban crossing in the heart of Miami

In the summer of 2022, Brownline USA made a major contribution to a challenging trenchless project in the middle of Miami,...

Read more
Crossing Arkansas River for Water supply in Oklahoma

In September 2022, Brownline’s gyro steering services were used to install a pipeline under Arkansas River near...

Read more
Gas pipeline with large curvature in Luxembourg

In september 2022, Brownline surveyed a drilling in Luxembourg for the installation of a gas pipeline. This pipeline was...

Read more
HDD outfalls for high voltage cables in Scotland

In the summer of 2022, Brownline surveyed two pilot bores in Scotland. These were outfalls to install high voltage power...

Read more
Award-winning crossing of Missouri River, again!

In 2021, HDD contractor Michels completed a 15,426 ft / 4,702 m pipeline crossing of Missouri River. This crossing was...

Read more
21 crossings in the heart of Toronto and Mississauga

In the summer of 2021, Brownline Canada helped break a national record: Michels Canada completed a 3,540 m / 11,614 ft...

Read more