Cases

Brownline | Cases

A customized service

The track record with our Gyro steering tool and add-on modules spans in excess of 20,000 completed drills. Each project has its own story and its own hurdles that needed to be negotiated. Our reliable and unique service offering was a big driver in the completion of each of these projects. 

Category
Surveying on steep slopes

In the fall of 2021, Brownline Canada surveyed an HDD for a new wastewater discharge plastic pipeline section that ties...

Read more
Preparing a hundred-year-old hydroelectric power station for the future with Drillguide GST!

In the summer of 2021, Brownline surveyed a 281-meter long bore at a beautiful location, in the middle of the Austrian...

Read more
Record-breaking drill job in Canada!

In collaboration with Michels Canada in 2021, we have broken the Canadian national record for the longest HDD bore by...

Read more
Crossing Mountains in Switzerland

At a very special location in the Swiss Alps, Brownline surveyed a drill job of 317 meters on behalf of our customer Zmoos...

Read more
Crossing Murray River for the Coastal Gas Link project

Brownline is proud to have worked with The Crossing Company on the successful completion of the Murray River crossing...

Read more
Natural gas pipeline renewal in Kokomo, Indiana

The gas pipeline system in in the northern part of Indiana is being renovated and upgraded where necessary. This 2.5-year...

Read more