Cases

Brownline | Cases

A customized service

The track record with our Gyro steering tool and add-on modules spans in excess of 20,000 completed drills. Each project has its own story and its own hurdles that needed to be negotiated. Our reliable and unique service offering was a big driver in the completion of each of these projects. 

Category
Challenging curved HDD in the middle of Florence

In the summer of 2022, Brownline surveyed a challenging HDD project in Italy. In the middle of Florence, contractor PATO...

Read more
Gas pipeline with large curvature in Luxembourg

In september 2022, Brownline surveyed a drilling in Luxembourg for the installation of a gas pipeline. This pipeline was...

Read more
Water main under a busy intersection

In August 2022, Brownline has surveyed a drilling in Rouveen, in Overijssel. Contractor J. de Lange Vroomshoop installed...

Read more
Fiber optic cable drilling with complex S-curve in Belgium

In August 2022, Brownline surveyed the pilot drilling for the installation of a fiber optic connection under the Scheldt...

Read more
Heat pipelines for Grolsch under the motorway

In June 2022, Brownline was involved in two parallel drillings in Enschede. A heat pipeline was to be connected to the...

Read more
Drilling across a marshy area for Shell’s Zydeco pipeline

In the summer of 2020, Brownline USA’s Drillguide Gyro Steering Tool was instrumental in constructing a pipeline...

Read more
Cookie policy