Cases

Brownline | Cases

A customized service

The track record with our Gyro steering tool and add-on modules spans in excess of 20,000 completed drills. Each project has its own story and its own hurdles that needed to be negotiated. Our reliable and unique service offering was a big driver in the completion of each of these projects. 

Category
Drilling to connect refinery to resource in Texas

The city of Silsbee is the home of a large petrochemical manufacturer. For the expansion of their facilities, Brownline...

Read more
Intersect drill for pipeline network expansion

The Baymark pipeline is an addition to the growing ethylene pipeline and logistics system in South Texas. For the construction...

Read more
Multiple drills for one pipeline project around Houston, USA

In 2019, Brownline embarked upon a total of 79 drills in the Houston area for a pipeline project with a combined length...

Read more
Rappahannock River crossing

In the spring of 2020, Brownline USA has taken part in 2 Shore Approaches and a 6700 foot (2040 meter) Barge to Barge...

Read more
Record drill under Missouri river

In 2019, Brownline has taken part in a US national record length drill of 13,247 foot (4.037 meter) in North Dakota. ...

Read more
Detroit River Crossing - USA & Canada border

In 2019, our experienced personnel from both sides of the border teamed up to complete the 3940ft (1200m) crossing under...

Read more