Cases

Brownline | Cases

A customized service

The track record with our Gyro steering tool and add-on modules spans in excess of 20,000 completed drills. Each project has its own story and its own hurdles that needed to be negotiated. Our reliable and unique service offering was a big driver in the completion of each of these projects. 

Category
Crossing the Corpus Christi ship channel for 24” water line

In February 2025, Brownline USA surveyed the pilot bore for a long HDD crossing in Corpus Christi, TX. This crossing under...

Read more
Parallel HDD crossings for Port of Ghent

At the end of 2024 and the beginning of 2025, Brownline surveyed a large number of drillings in Ghent using the Drillguide...

Read more
Parallel crossings under runways at Texel International Airport

In February 2025, Brownline surveyed seven drills on Texel. From Den Burg, a new medium-voltage line will be installed...

Read more
2 parallel HDD crossings under 12 carriageways in Milton Keynes

In July 2024, Brownline surveyed two directional drills in England. Near Milton Keynes, our client FlowTek HDD, commissioned...

Read more
Minimal disruption and maximal accuracy for two parallel HDDs under university campus

In April 2024, Brownline USA surveyed two parallel HDD crossings in Baton Rouge, LA with the Drillguide Gyro Steering...

Read more
Parallel HDDs for cathodic protection under a crude oil storage tank

In October 2023, Brownline Canada provided guidance services for several short parallel HDD crossings. At a crude oil...

Read more