Cases

Brownline | Cases

A customized service

The track record with our Gyro steering tool and add-on modules spans in excess of 20,000 completed drills. Each project has its own story and its own hurdles that needed to be negotiated. Our reliable and unique service offering was a big driver in the completion of each of these projects. 

Category
Climbing a river slope for safer pipelines in northeastern Alberta

In January 2022, Brownline Canada steered two parallel pilot bores near Fort McMurray, Alberta. The two steel pipes are...

Read more
Crossing under a creek and a lake for gas distribution in Louisville, Kentucky

In the summer of 2021, Brownline USA was involved in a gas pipeline installation project in Louisville, KY. It proved...

Read more
Drilling over 6000 feet under a Danish canal!

In 2021, Brownline was involved in a challenging and lengthy drilling project: installing a fiber optic cable spanning...

Read more
Expanding the Dutch power grid

The power grid’s capacity in the Netherlands is increasingly taxed. To ensure that it remains stable for consumers,...

Read more
Safely replacing a natural gas pipeline in Vicksburg, Mississippi

When it comes to natural gas, safety is always the number one priority. In September 2021, Brownline contributed in helping...

Read more
Drilling while floating in Szczecin, Poland

In 2021, Brownline was able to make a significant contribution to a project near the city of Szczecin in Poland. We were...

Read more