Record drill under Missouri river

In 2019, Brownline has taken part in a US national record length drill of 13,247 foot (4.037 meter) in North Dakota. ...

Read more
Victoria Harbour crossing

Our Canadian operations are proud to have assisted in the completion of a 940m crossing under Victoria Harbour in 2019...

Read more
Detroit River Crossing - USA & Canada border

In 2019, our experienced personnel from both sides of the border teamed up to complete the 3940ft (1200m) crossing under...

Read more
Longest Cable duct in Bahrain

Brownline executed a drilling in Bahrain to install a power line next to the Prince Khalifah Bin Salman Causeway Bridge....

Read more
Johan Sverdrup Pipeline, Mongstad Norway

Johan Sverdrup is one of the five largest oil fields on the Norwegian continental shelf. With expected resources of between...

Read more
4 parallel drills for network platform DolWin 6

In 2018, Brownline surveyed a series of directional drills for the offshore grid connection project 'DolWin 6'. Two sets...

Read more