Cases

Brownline | Cases

A customized service

The track record with our Gyro steering tool and add-on modules spans in excess of 20,000 completed drills. Each project has its own story and its own hurdles that needed to be negotiated. Our reliable and unique service offering was a big driver in the completion of each of these projects. 

Category
Complicated intersect drilling in Texan marsh

In March 2022, Brownline USA surveyed a long and challenging drilling in Port Arthur, TX. This 8753 ft / 2668 m bore led...

Read more
Drilling across a marshy area for Shell’s Zydeco pipeline

In the summer of 2020, Brownline USA’s Drillguide Gyro Steering Tool was instrumental in constructing a pipeline...

Read more
Climbing a river slope for safer pipelines in northeastern Alberta

In January 2022, Brownline Canada steered two parallel pilot bores near Fort McMurray, Alberta. The two steel pipes are...

Read more
Replacing a natural gas pipeline in the middle of Detroit

In October 2021 Brownline has been involved in the replacement of a natural gas pipeline. This 2700-feet bore was commissioned...

Read more
Expanding the Dutch power grid

The power grid’s capacity in the Netherlands is increasingly taxed. To ensure that it remains stable for consumers,...

Read more
Safely replacing a natural gas pipeline in Vicksburg, Mississippi

When it comes to natural gas, safety is always the number one priority. In September 2021, Brownline contributed in helping...

Read more